Enbridge L3r Early Works

Project Description:

Sureway was contracted by Enbridge for tank lot construction, including all mechanical, electrical and civil construction to the containment limits.

Project Statistics:

Z

Location :

Hardisty, AB

Z

Duration :

August 2017 – May 2018

Z

Owner :

Enbridge

Our Services:

  • ZMechanical
  • ZUnderground Utilities
  • ZMechanical

Scope of Work

  • Z1,000 m3 - HDPE firewater installation
  • Z14 Ha - Clearing, stripping and grading
  • Z3.7 Ha - Lining containment
  • ZBuilding demolition, building grading, structural fabrication for tank lot access
  • ZConstruction of 3 tank foundations
  • ZFinal grading and gravel for tank lot, laydown and access roads
  • ZInstallation and coating for tank piping including riser fabrication for 3 tanks
  • ZTank lot electrical installation
  • ZTank lot piling