Enbridge South Edmonton Terminal

Project Description:

Sureway was contracted by Enbridge for all earthworks, and underground utility installation for a new tank terminal expansion adding five 550,000 bbl tanks at the South Edmonton Terminal.

Project Statistics:

Z

Location :

Edmonton, AB
Z

Duration :

September 2013 – May 2016

Z

Owner :

Enbridge

Our Services:

  • ZEarthworks
  • ZUnderground Utilities
  • ZMechanical

Scope of Work

  • Z32 Hectares - Clearing and stripping of land (40% Wetlands)
  • Z700,000 m3 - Bulk Earthworks
  • Z5 tanks - 550,000 bbl tank pad foundations
  • Z750,000 t Gravel - (400,000 t placed in winter)
  • Z4,700 lm - Excavation and backfill of product pipe
  • Z3,500 lm - Excavation and backfill of electrical installation
  • Z3,000 lm - HDPE firewater installation (up to 600 mm Dia.)
  • Z2,600 lm - CSP/PVC drainage pipe
  • Z700 lm - PVC sub-drain system
  • Z1,200 m3 - Concrete structures
  • Z10 - Lift stations with pumps and force mains