Project Description:
Sureway was contracted by Enbridge for all earthworks, and underground utility installation for a new tank terminal expansion adding five 550,000 bbl tanks at the South Edmonton Terminal.
Project Statistics:
Location :
Edmonton, AB
Duration :
September 2013 – May 2016
Owner :
Enbridge
Our Services:
- ZEarthworks
- ZUnderground Utilities
- ZMechanical
Scope of Work
- Z32 Hectares - Clearing and stripping of land (40% Wetlands)
- Z700,000 m3 - Bulk Earthworks
- Z5 tanks - 550,000 bbl tank pad foundations
- Z750,000 t Gravel - (400,000 t placed in winter)
- Z4,700 lm - Excavation and backfill of product pipe
- Z3,500 lm - Excavation and backfill of electrical installation
- Z3,000 lm - HDPE firewater installation (up to 600 mm Dia.)
- Z2,600 lm - CSP/PVC drainage pipe
- Z700 lm - PVC sub-drain system
- Z1,200 m3 - Concrete structures
- Z10 - Lift stations with pumps and force mains