Project Description:
Sureway Industrial Services Ltd. was contracted by Enbridge for the expansion of the existing Woodlands Pump Station; addition of a new pump and sump tank.
Project Statistics:
Location :
Kearl Lake Plant site, Northern AB
Duration :
2014-2015
Owner :
Enbridge
Our Services:
- ZMechanical
Scope of Work
- ZUpgrades to existing two 5750 HP pump units
- ZAddition of one (1) 5750 HP mainline pump unit series with existing pumps
- ZAddition of VFD building
- ZManage and supply all site Electrical and Instrumentation contractors
- ZExpansion of existing pump shelter
- ZUpgrades to outdoor switchgear with VCB, ultrasonic flow meter and static mixer; cathodic protection upgrade
- ZAdd new connections to existing sump and remove and replace existing surge tank and complete CTIB modification
- ZIncluded all site earthworks, concrete, paint and insulation