Malcolm Tweddle & Edith Rogers Dry Ponds

Project Description:

Construction of Malcolm Tweddle & Edith Rogers Dry Ponds and sewer improvements to mitigate localized flooding during large storm events. Project is located within the greenspace of two adjacent schools (Malcolm Tweddle School and Edith Rogers School).

New large diameter storm piping tied into existing storm infrastructure at two separate locations. Complex work around multiple existing power and gas utilities required continuous coordination efforts.

Project Statistics:

Z

Location :

Edmonton, AB

Z

Duration :

April 2019 – Oct 2020

Z

Owner :

EPCOR Drainage

Our Services:

  • ZEarthworks
  • ZUnderground Utilities

Scope of Work

  • Z211,500 m3 – Earthworks For Pond Excavation
  • Z287 lm – 1200mm—3000mm Large Diameter Concrete Storm Pipe
  • Z1 ls – Demolition of Existing Building (incl. Asbestos Abatement)
  • Z1 ls – Electrical Works, New and Re-installation of Street Lighting and SCADA Cable installation and Power Pedistals
  • Z1 ls – Landscaping, Tosoil Placement, Sod and Tree Install