Enbridge Gibson Heavy Construction

Project Description:

Sureway was contracted by Enbridge for the construction of 36” & 42” connection piping, including all civil, mechanical, electrical and structural installations.

Project Statistics:

Z

Location :

Hardisty, AB

Z

Duration :

April 2018 – Nov 201

Z

Owner :

Enbridge

Our Services:

  • ZMechanical
  • ZUnderground Utilities

Scope of Work

  • Z4,000 m3 – Brownfield excavation and backfill for buried lines
  • Z4,400 WIN – Shop fabrication of NPS 36” and 42” spools
  • Z3,500 WIN – Field installation of NPS 36” and 42” spools
  • ZPipe insulation and coating
  • ZFabrication and installation of structural steel pipe rack and supports
  • ZElectrical installations for instrumentation & controls and heat tracing
  • ZCommissioning support
  • ZPiling