Enbridge South Edmonton Terminal

Project Description: Sureway was contracted by Enbridge for all earthworks, and underground utility installation for a new tank terminal expansion adding five 550,000 bbl tanks at the South Edmonton Terminal. Project Statistics: Z Location : Edmonton, AB Z Duration :...

Enbridge L3r Early Works

Project Description: Sureway was contracted by Enbridge for tank lot construction, including all mechanical, electrical and civil construction to the containment limits. Project Statistics: Z Location : Hardisty, AB Z Duration : August 2017 – May 2018 Z Owner :...

Discovery Park Development

Project Description: Earthworks and drainage for Remington Development Corporation – Discovery Park. (Projects within Discovery Tender: Offsite Storm, Grading, UG installation, Multi-Tenant Building Site). Whitemud Creek – multi-level outfall system...

Keswick Grading Stage 19

Project Description: Excavation, hauling, placement, grading and compaction of on-site clay. Approximately 200,000m3 of Topsoil stripping, 370,000m3 of Common excavation for site and SWMF. Stripping of topsoil and marginal material to onsite stockpiles and snake pit...

199 Street—23 Ave To 35 Ave Project

Project Description: Earthworks and underground utility installation to upgrade a rural collector road to an urban arterial c/w Sanitary, Storm, Water Transmission Main and Creek Crossing. Existing roadway where traffic had to be maintained. Installation of 1600 lm of...