by Kacper Sikora | Dec 21, 2021
Project Description: Sureway was contracted by Enbridge for all earthworks, and underground utility installation for a new tank terminal expansion adding five 550,000 bbl tanks at the South Edmonton Terminal. Project Statistics: Z Location : Edmonton, AB Z Duration :...
by Kacper Sikora | Dec 17, 2021
Project Description: Sureway was contracted by Enbridge for tank lot construction, including all mechanical, electrical and civil construction to the containment limits. Project Statistics: Z Location : Hardisty, AB Z Duration : August 2017 – May 2018 Z Owner :...
by Kacper Sikora | Dec 14, 2021
Project Description: Earthworks and drainage for Remington Development Corporation – Discovery Park. (Projects within Discovery Tender: Offsite Storm, Grading, UG installation, Multi-Tenant Building Site). Whitemud Creek – multi-level outfall system...
by Kacper Sikora | Dec 14, 2021
Project Description: Excavation, hauling, placement, grading and compaction of on-site clay. Approximately 200,000m3 of Topsoil stripping, 370,000m3 of Common excavation for site and SWMF. Stripping of topsoil and marginal material to onsite stockpiles and snake pit...
by Kacper Sikora | Dec 14, 2021
Project Description: Earthworks and underground utility installation to upgrade a rural collector road to an urban arterial c/w Sanitary, Storm, Water Transmission Main and Creek Crossing. Existing roadway where traffic had to be maintained. Installation of 1600 lm of...