by Kacper Sikora | Dec 10, 2021
Project Description: Earthworks and underground utility installation to meet 1:100 year storm requirements. Work area included: residential areas, existing roadways, adjacent to a school, through natural park areas. Public consultation and notifications. Existing...
by Kacper Sikora | Dec 10, 2021
Project Description: This project was part of the Regional Municipality of Wood Buffalo’s latest Master Water and Master Wastewater plans to update Fort McMurray’s aging infrastructure. In 2015, Sureway was retained by the RMWB with Urban Systems as the municipality’s...
by Kacper Sikora | Dec 10, 2021
Project Description: Earthworks and underground utility installation of an Industrial Subdivision. Stripped 170,000m3 of topsoil (Offsite haul of 150,000m3 of topsoil). Excavated 530,000m3 of material to grade industrial lots, roads and two storm ponds. Installation...