by Kacper Sikora | Dec 21, 2021
Project Description: Sureway was contracted by Enbridge for all earthworks, and underground utility installation for a new tank terminal expansion adding five 550,000 bbl tanks at the South Edmonton Terminal. Project Statistics: Z Location : Edmonton, AB Z Duration :...
by Kacper Sikora | Dec 17, 2021
Project Description: Sureway was contracted by Enbridge for civil works associated with the installation of 850m of 42” pipe. Project Statistics: Z Location : Hardisty, AB Z Duration : May 2016 – May 2017 Z Owner : Enbridge Our Services: ZUnderground Utilities...
by Kacper Sikora | Dec 17, 2021
Project Description: Sureway was contracted by Enbridge for tank lot construction, including all mechanical, electrical and civil construction to the containment limits. Project Statistics: Z Location : Hardisty, AB Z Duration : August 2017 – May 2018 Z Owner :...
by Kacper Sikora | Dec 14, 2021
Project Description: Earthworks and drainage for Remington Development Corporation – Discovery Park. (Projects within Discovery Tender: Offsite Storm, Grading, UG installation, Multi-Tenant Building Site). Whitemud Creek – multi-level outfall system...
by Kacper Sikora | Dec 14, 2021
Project Description: This Project included the following: Open cut trenching of 150m of 450mm DR11 HDPE pipe. With approximately 2km of HDD trenchless along 199 street and under a the existing creek. 30m of case boring into a manhole. Also included the installation of...