Start Rehabilitation – Hwy 28 Crossing

Project Description: The project involved the removal and replacement of approximately 700m of active sanitary sewer trunk mains with new PVC pipes with sizes from 1200mm to 1500mm. Slip-lining 98m of 1200mm concrete pipe with a 900mm HDPE Line. The work included...

199 Street—23 Ave To 35 Ave Project

Project Description: Earthworks and underground utility installation to upgrade a rural collector road to an urban arterial c/w Sanitary, Storm, Water Transmission Main and Creek Crossing. Existing roadway where traffic had to be maintained. Installation of 1600 lm of...

Ekota Dry Pond and Menisa Storm Relief

Project Description: Earthworks and underground utility installation to meet 1:100 year storm requirements. Work area included: residential areas, existing roadways, adjacent to a school, through natural park areas. Public consultation and notifications. Existing...

Laurel Stage 17

Project Description: Underground utility installation of an urban subdivision. Installation of 2,200 meters of storm pipe ranging in size from 300mm to 1200mm. Installation of 2,500 meters of sanitary pipe ranging in size from 200mm to 300mm. Installation of 3,000...