by Kacper Sikora | Dec 14, 2021
Project Statistics: Z Location : Fort McMurray, AB Z Duration : July 2016– October 2017 Z Owner : Regional Municipality of Wood Buffalo (RMWB) Our Services: ZMechanical Project Description: The MacKenzie Lift Station Diversion & Sewer Upgrade project was completed...
by Kacper Sikora | Dec 14, 2021
Project Description: Excavation, hauling, placement, grading and compaction of on-site clay. Approximately 200,000m3 of Topsoil stripping, 370,000m3 of Common excavation for site and SWMF. Stripping of topsoil and marginal material to onsite stockpiles and snake pit...
by Kacper Sikora | Dec 14, 2021
Project Description: Earthworks and underground utility installation to upgrade a rural collector road to an urban arterial c/w Sanitary, Storm, Water Transmission Main and Creek Crossing. Existing roadway where traffic had to be maintained. Installation of 1600 lm of...
by Kacper Sikora | Dec 10, 2021
Project Description: Earthworks and underground utility installation to meet 1:100 year storm requirements. Work area included: residential areas, existing roadways, adjacent to a school, through natural park areas. Public consultation and notifications. Existing...
by Kacper Sikora | Dec 10, 2021
Project Description: Underground utility installation of an urban subdivision. Installation of 2,200 meters of storm pipe ranging in size from 300mm to 1200mm. Installation of 2,500 meters of sanitary pipe ranging in size from 200mm to 300mm. Installation of 3,000...