Malcolm Tweddle & Edith Rogers Dry Ponds

Project Description: Construction of Malcolm Tweddle & Edith Rogers Dry Ponds and sewer improvements to mitigate localized flooding during large storm events. Project is located within the greenspace of two adjacent schools (Malcolm Tweddle School and Edith...

Crystallina Stage 8B & 13

Project Description: Sureway acted as General Contractor on the 117 lot residential development for Crystallina Stage 8B & 13. Scope included Underground Deep Utility Installation (Storm, Sanitary, Water), Grading/Earthworks, Surface (Roadways) and Shallow...

Crystal Creek Stage 1

Project Description: The project involved 44,000m3 of organic stripping, 17,000m3 of onsite common ex and 34,000m3 of common import. Over 1000 lm of sanitary, storm and water main installed including 70lm of case bore under Hwy 39/50Ave and 9m deep manhole tie-in on...

Aster Stage 2/1/4

Project Description: The project involved 130,000m3 of topsoil and marginal stripping to stockpile, 170,000m3 of common ex from SWMF, 185,000 m3 of engineered fill and over 20,000m2 of subgrade completed. Over 4 km of pipe installed with 35 manholes, 1800mm dia....

Agrium Phosphogypsum Stack Expansion

Project Description: Sureway, maintain continuity throughout site was contracted by Agrium Inc. to construct an extension to their existing phosphogypsum stack system. The total area of phase 3 stack extension was approximately 28 hectares. Dyke construction was up to...